Search - Number 17 - ASSESSMENT OF TIME TO SCHEDULED MAINTENANCE AND REPAIR USING CONCEPTION OF RELIABILITY CENTRED MAINTENANCE OF NPP EQUIPMENT

ASSESSMENT OF TIME TO SCHEDULED MAINTENANCE AND REPAIR USING CONCEPTION OF RELIABILITY CENTRED MAINTENANCE OF NPP EQUIPMENT
Cover not present ASSESSMENT OF TIME TO SCHEDULED MAINTENANCE AND REPAIR USING CONCEPTION OF RELIABILITY CENTRED MAINTENANCE OF NPP EQUIPMENT
Category: Number 17
Publication: 17
Summary

There is developed the model to predict a time to the scheduled maintenance and repair for infrequent failures NPP equipment based by assessment of gamma-percentile operation time of failure. Data on failures, trend to change main parameters of the technical condition of equipment and expert assessment of operation time to failure of equipment are taken into account.

Keywords: Reliability Centred Maintenance, DN-distribution, main parameter of the technical condition, operation time to failure, nuclear power plant, physico-statistical reliability assessment Bayesian estimate, expert assessment.

Full text